project admin

Ultra Project Management

Version: 17.07

Ultra Project management view provides the facilities to add new Ultra Projects to be managed through IMonitor-X, modify already added such configurations and also to remove them as well. To access this view, select the Nodes item from the main menu.

prj menu

Please note that the project management functionalities illustrated below are accessible only for the admin users (users that belong to the Super User group). If you are a non-admin user, the above action will take you to the projects list.

Importing projects of a space

The easiest way to add project configurations is to use the import functionality, which connects to an active UltraESB-X node of a selected space and imports the configurations of the projects deployed in that node.

  • To use this feature, first click on Import Projects of Space button.

project import btn
  • Then from the next pop-up dialog, select a cluster space to import projects from. Please ensure that at least one UltraESB-X instance of this cluster space is in active state.

import prj dlg1
  • The next pop-up will show a list of projects (with versions) that were found on the selected space. Select the projects to be imported, then select the user groups to be assigned to the selected projects and finally click Import button.

Please note that the users belong to the super user group will have access to any Ultra Project, irrespective of whether the super user group is assigned for that project or not.
import prj dlg2
  • Then IMonitor-X will import these project details to the the database and finally provide a report similar to the above. Please note that if a project with the same project ID and version already exists in the database, such projects will be skipped from importing. When you close the report pop-up, the newly imported projects should be visible in the projects list.

import prj dlg3

Manually adding a project

If it not possible to import project as mentioned above, you can manually add projects to IMonitor-X as follows.

  • First click on Add New Project button, which will open the project addition form.

project add btn
  • On the form, fill the Project ID (1), Project Name (2) and Project Version (3) fields first. Although you can provide any sensible value as the Project Name, you must ensure that Project ID and Project Version values are exactly similar to the values configured in actual Ultra Project. Optionally a description (4) for the project can also be provided.

The project ID and version values are configured at the top of the project.xpml file inside any Ultra Project.
  • Next select the cluster space (5) to which this project belongs to and then select one or more user groups (6) that can have access to this project.

Please note that the users belong to the super user group will have access to any Ultra Project, irrespective of whether the super user group is assigned for that project or not.
project add form
  • Finally click on the Save (7) button to save these configurations to the database.

Ultra project list

project admin list

All the project added through either of the above methods are listed in the projects list. This tabular view displays the below information of each project in addition to a set of action buttons.

Project ID (1)

The ID of the project. A project in a cluster space is uniquely identified by this project ID in combination with project version.

Name (2)

The name of the project

Version (3)

The version of the project

Description (4)

An optional description about the project

Space (5)

The name of the cluster space to which this project belongs to

The action buttons provide the following functionality for each instance.

View (6)

Navigates to the Details View corresponding to the particular project

Edit (7)

Can be used to modify the properties of an already added project. Clicking on this button will take you to the same form that was used to add a new project, which will be filled with already configured property values. You can modify any of those properties and save the new values by clicking on Save button.

Remove (8)

can be used to remove an already added project. When this button is clicked, you will get a confirmation dialog and the project will be removed once confirmed.

In addition, this list can be refined to display the projects that belong to a particular cluster space, using the Cluster Spaces drop-down list (9) and the search box (10) can be used to search projects based on project ID, name, version and description.

In this topic
In this topic
Contact Us